Step-by-step implementation guide β pre-implementation checklist, onboarding, staff training, go-live runbook, and ROI tracking.
BoomCloud β Implementation Playbook (DSO)
BoomCloud Implementation Playbook
Membership & Patient Financing Platform for Dental Support Organizations
1. Executive Summary
What BoomCloud Does
BoomCloud is a membership plan management platform that enables dental organizations to create, sell, and manage in-house membership plans for uninsured patients while providing patient financing solutions. The platform automates recurring billing, tracks member benefits, integrates with practice management systems, and provides real-time analytics on membership revenue across locations.
Why DSOs Benefit from Membership & Patient Financing AI
DSOs operating at scale face a significant strategic challenge: uninsured patients represent 50%+ of the population, yet most practices lack a systematic approach to capture this revenue. BoomCloud addresses this through:
- Standardization at Scale: Deploy a unified membership model across 15β50 locations rather than managing disparate, manually-tracked "in-house discount plans" that vary by location and create compliance exposure
- Centralized Revenue Visibility: Real-time dashboards aggregate membership recurring revenue (MRR) across the entire organization, enabling accurate forecasting and board reporting
- Data-Driven Pricing Optimization: Cross-location data enables sophisticated analysis of pricing elasticity, plan tier performance, and regional variations that single practices cannot achieve
- Reduced Administrative Burden: Automation of billing, renewals, and benefit tracking eliminates 10-15 hours/week of manual work per location currently spent managing spreadsheet-based discount programs
- Patient Retention Leverage: Members demonstrate 2-3x higher case acceptance rates and significantly lower attritionβa multiplier effect when applied across 15+ locations
Expected Timeline: Decision to Full Deployment
| Phase | Duration | Milestone |
|---|---|---|
| Pre-Implementation | Weeks 1β2 | Contracts signed, baseline metrics captured, stakeholder alignment complete |
| Configuration & Integration | Weeks 2β3 | PMS integrations live, test environment validated |
| Wave 1 Pilot (2β3 locations) | Weeks 4β6 | Pilot locations fully operational, initial learnings captured |
| Wave 2 Expansion (5β8 locations) | Weeks 7β10 | Second wave deployed, playbook refined |
| Wave 3+ Full Rollout | Weeks 11β16 | All remaining locations live |
| Post-Launch Optimization | Weeks 17β24 | Full optimization cycle complete, ROI validated |
Total Timeline: 16β24 weeks for full deployment across 15β50 locations
2. Pre-Implementation Checklist (Weeks 1β2)
Technical Requirements
Hardware Requirements
β Workstations at each location with minimum specs: Windows 10/11 or macOS 10.15+, 4GB RAM, modern browser (Chrome, Edge, or Safari) β Tablet devices for patient-facing enrollment (optional but recommended): iPad or Android tablet with 10"+ screen β Receipt/card printers if in-office payment processing is required
Software Requirements
β Practice Management System: Dentrix (G6.2+), Eaglesoft (21+), Open Dental (21.1+), Denticon, or other supported PMS β Modern web browser updated to current version β PDF reader for patient agreements and documentation β Email system for automated member communications
Network Requirements
β Minimum 25 Mbps download / 5 Mbps upload per location β Stable internet connection with <100ms latency to BoomCloud servers β HTTPS/TLS 1.2+ capability for secure data transmission β Port 443 open for outbound connections
Integration Requirements
β Verify PMS version compatibility with BoomCloud API β Confirm payment processor compatibility (Stripe is primary; verify alternatives) β Identify patient communication system (email, SMS) for integration
Vendor Onboarding Steps
| Step | Owner | Timeline | Notes |
|---|---|---|---|
| π΅ Execute enterprise agreement and BAA | Legal / Vendor | Day 1β3 | Ensure multi-location pricing is optimized |
| π΅ Assign dedicated BoomCloud Customer Success Manager (CSM) | Vendor | Day 3 | Request enterprise-tier CSM with DSO experience |
| π΅ Schedule kick-off call with BoomCloud implementation team | Operations Lead | Day 4β5 | Include IT lead and 1-2 regional managers |
| π΅ Obtain access to BoomCloud Academy training resources | Vendor | Day 5 | Confirm unlimited seat licenses for training |
| π΅ Establish support escalation contacts and SLAs | Vendor / IT | Day 5β7 | Document Tier 1, 2, 3 support paths |
Key Vendor Contacts to Establish
| Role | Purpose | Contact Method |
|---|---|---|
| Customer Success Manager | Strategic guidance, business reviews | Direct email/phone |
| Technical Implementation Specialist | Integration, configuration | Slack/email |
| Tier 1 Support | Day-to-day issues | Support portal/chat |
| Tier 2 Support | Complex technical issues | Escalation from Tier 1 |
| Account Executive | Contract modifications, expansion | Direct email |
Data/Access Prerequisites
β Admin login credentials for each location's PMS β π΅ API keys or service account credentials (request from PMS vendor if needed) β Patient data export permissions for historical analysis β Access to existing membership/discount plan documentation (if any) β Payment processor merchant account credentials β Email sending domain DNS access (for SPF/DKIM configuration)
Internal Stakeholder Alignment
π£ Who Needs to Approve
| Stakeholder | Approval Required For | Timeline |
|---|---|---|
| CEO/Board | Investment decision, strategic alignment | Before Week 1 |
| CFO | Budget allocation, ROI targets, pricing strategy | Before Week 1 |
| Chief Dental Officer | Clinical plan structure, benefit levels | Week 1 |
| VP of Operations | Implementation timeline, resource allocation | Week 1 |
| General Counsel | BAA, patient agreement templates, compliance | Week 1 |
| CTO/IT Director | Technical architecture, security review | Week 1 |
Who Needs to Be Informed
| Stakeholder | Communication Need | Channel |
|---|---|---|
| Regional Managers | Rollout timeline, location selection, their role | Regional manager briefing (see Section 7) |
| Office Managers | What's coming, how it affects their location | Email + regional manager cascade |
| Providers | Clinical rationale, patient conversation changes | CDO communication |
| Front Desk Staff | New workflow introduction | Office manager cascade |
| Billing Staff | Revenue recognition changes | Finance lead communication |
Baseline Metrics to Capture BEFORE Go-Live
β οΈ Critical: Capture these metrics consistently across ALL locations before any rollout begins. Inconsistent baseline measurement is the #1 reason DSOs cannot demonstrate ROI post-implementation.
Revenue & Patient Metrics
| Metric | Definition | Data Source | Capture Method |
|---|---|---|---|
| Uninsured patient % | Patients with no dental insurance / total active patients | PMS | Standardized report |
| Uninsured patient revenue | Revenue from uninsured patients (12-month trailing) | PMS + Accounting | Manual calculation |
| Current discount plan enrollment | Patients on any in-house discount plan | PMS or spreadsheet | Manual count |
| Case acceptance rate (uninsured) | Accepted treatment value / presented treatment value for uninsured patients | PMS | Standardized report |
| Average treatment value (uninsured) | Mean revenue per uninsured patient visit | PMS | Standardized report |
| Patient attrition rate | Patients who haven't visited in 18+ months / total patients | PMS | Standardized report |
Operational Metrics
| Metric | Definition | Data Source | Capture Method |
|---|---|---|---|
| Time spent managing discount plans | Hours/week staff spend on manual tracking | Office manager survey | Survey |
| Patient financing utilization | % of large cases using third-party financing | PMS + financing vendor | Manual count |
| Accounts receivable (uninsured) | Outstanding patient balances >30 days | PMS | Standardized report |
| Plan renewal rate | (If existing plans) Renewals / total up for renewal | Manual tracking | Spreadsheet |
β οΈ Standardization Protocol for Baseline Metrics
- Create standardized report templates in each PMS variant used across the organization
- Define the measurement period: Use the same 12-month lookback window for all locations
- Assign metric capture to a single owner (recommend: central finance or operations analyst)
- Validate data quality before acceptingβflag locations with incomplete data
- Store baselines in a central repository (SharePoint, Google Drive, or BI tool)
- Document any location-specific anomalies (e.g., "Location #12 had 2 months of PMS migrationβdata incomplete")
Enterprise-Level Requirements
Network Standards Across Locations
β Audit internet speeds at all locationsβflag any below 25 Mbps β Verify firewall configurations allow BoomCloud domains (*.boomcloudapps.com) β Confirm VPN configurations (if used) don't block required connections β Document network provider and contact for each location
Centralized vs. Location-Level Hosting Decision
Recommendation: Cloud-hosted (SaaS) with centralized admin and location-level access
BoomCloud is a cloud-native platformβno on-premise hosting decision required. However, you must decide:
| Decision | Recommendation | Rationale |
|---|---|---|
| Admin hierarchy | Centralized master admin β Regional admin β Location admin | Enables standardization while allowing regional customization |
| Payment processing | Centralized merchant account | Simplified reconciliation, better rates, reduced fraud risk |
| Data access | Centralized reporting dashboard with location-level drill-down | Essential for portfolio-level visibility |
Single Sign-On (SSO) Configuration
β π΅ Confirm BoomCloud SSO compatibility with your identity provider (Okta, Azure AD, Google Workspace) β Provide IdP metadata to BoomCloud implementation team β Test SSO authentication before rollout β Document SSO setup for IT knowledge base
Centralized Credentialing
β Establish user role taxonomy:
- Org Admin: Full access, configuration, reporting across all locations
- Regional Admin: Access to assigned region's locations
- Location Admin: Access to single location, limited configuration
- Staff User: Transaction and enrollment access only
- Read-Only: Reporting access only β Define credential provisioning workflow (who creates accounts, approval process) β Define credential deprovisioning workflow (termination process)
Stakeholder Alignment Map
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β BOARD / INVESTORS β
β Need: ROI justification, competitive positioning, growth story β
β Touchpoint: Quarterly board update, pre-decision approval β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β
βΌ
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β C-SUITE β
β CEO: Strategic alignment | CFO: Financial model | CDO: Clinical β
β COO/VP Ops: Owns implementation | CTO: Technical approval β
β Touchpoint: Weekly implementation steering committee β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β
βΌ
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β REGIONAL MANAGERS β
β Need: Timeline, location selection rationale, their role β
β Touchpoint: Bi-weekly rollout status calls, wave planning β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β
βΌ
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β LOCATION OFFICE MANAGERS β
β Need: What's changing, training schedule, go-live date β
β Touchpoint: Regional manager cascade, champion training β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β
βΌ
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
β PROVIDERS β
β Need: Why this matters, patient conversation changes, support β
β Touchpoint: CDO communication, champion-led training β
βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
3. Location Readiness Assessment
Scoring Framework
Score each factor from 1 (lowest readiness) to 5 (highest readiness) for every location.
Factor 1: IT Infrastructure Maturity
| Score | Network Speed | Hardware Age | PMS Version | Description |
|---|---|---|---|---|
| 5 | >100 Mbps | <2 years | Current | Enterprise-grade infrastructure |
| 4 | 50β100 Mbps | 2β3 years | Current-1 | Strong infrastructure with minor gaps |
| 3 | 25β50 Mbps | 3β4 years | Current-2 | Adequate but may need updates |
| 2 | 10β25 Mbps | 4β5 years | Current-3 | Significant infrastructure gaps |
| 1 | <10 Mbps | >5 years | >Current-3 | Major infrastructure remediation needed |
Factor 2: Staff Tenure and Adaptability
| Score | Staff Turnover (Annual) | Tech Comfort | Training History | Description |
|---|---|---|---|---|
| 5 | <15% | High | Completed 2+ tech implementations | Stable, tech-savvy team |
| 4 | 15β25% | Above average | Completed 1 tech implementation | Good adaptability |
| 3 | 25β35% | Average | Some tech training | Typical adaptability |
| 2 | 35β50% | Below average | Minimal training history | May struggle with adoption |
| 1 | >50% | Low | No recent training | High risk for adoption challenges |
Factor 3: Patient Volume
| Score | Monthly Patient Visits | Impact Potential | Risk Level | Description |
|---|---|---|---|---|
| 5 | 500β700 | Very high | Moderate | Optimal volumeβhigh impact, manageable |
| 4 | 700β900 | High | Moderate-high | Good candidate with close monitoring |
| 3 | 300β500 | Moderate | Low-moderate | Lower risk but lower impact |
| 2 | >900 | Very high | High | May overwhelm staff during transition |
| 1 | <300 | Low | Low | Limited ROI potential |
Factor 4: Tech Stack Compatibility
| Score | PMS | Payment Integration | Prior BoomCloud Use | Description |
|---|---|---|---|---|
| 5 | Tier 1 (Dentrix, Eaglesoft, Open Dental) + current version | Stripe | Yes | Fully compatible |
| 4 | Tier 1 + current-1 version | Stripe or compatible | No | Highly compatible |
| 3 | Tier 1 + older version OR Tier 2 PMS | Some compatibility work | No | Compatible with configuration |
| 2 | Tier 2 PMS + older version | Manual workaround needed | No | Requires significant integration work |
| 1 | Legacy/unsupported PMS | Incompatible | No | Integration not feasible without PMS upgrade |
Factor 5: Local Champion Availability
| Score | Champion Available | Champion Profile | Description |
|---|---|---|---|
| 5 | Yes | Tech-forward dentist + engaged office manager | Ideal champion pairing |
| 4 | Yes | Either tech-forward provider OR strong office manager | Good champion potential |
| 3 | Potential | Staff member with interest but unproven | Champion development needed |
| 2 | Uncertain | No clear candidate identified | Will need external champion support |
| 1 | No | Staff resistant, no leadership support | Champion must be assigned from regional team |
Composite Readiness Score Calculation
Composite Score = (IT Γ 1.0) + (Staff Γ 1.5) + (Volume Γ 1.0) + (Tech Stack Γ 1.5) + (Champion Γ 2.0)
| Composite Score | Readiness Tier | Rollout Recommendation |
|---|---|---|
| 28β35 | Tier 1 (High Readiness) | Wave 1 candidate |
| 21β27 | Tier 2 (Moderate-High) | Wave 2 candidate |
| 14β20 | Tier 3 (Moderate) | Wave 3 candidate |
| 7β13 | Tier 4 (Low) | Requires remediation before rollout |
Sample Location Readiness Matrix
| Location | IT (Γ1.0) | Staff (Γ1.5) | Volume (Γ1.0) | Tech (Γ1.5) | Champion (Γ2.0) | Composite | Tier |
|---|---|---|---|---|---|---|---|
| Springfield | 4 | 4 (6) | 5 | 5 (7.5) | 5 (10) | 32.5 | Tier 1 |
| Riverside | 5 | 5 (7.5) | 4 | 4 (6) | 4 (8) | 30.5 | Tier 1 |
| Oakwood | 3 | 3 (4.5) | 3 | 4 (6) | 3 (6) | 22.5 | Tier 2 |
| Lakeside | 2 | 2 (3) | 2 | 3 (4.5) | 2 (4) | 15.5 | Tier 3 |
| Downtown | 1 | 1 (1.5) | 4 | 2 (3) | 1 (2) | 11.5 | Tier 4 |
Recommended Rollout Sequence Based on Scores
Wave 1 (Pilot): Select 2β3 locations from Tier 1 that also represent portfolio diversity:
- Include at least one urban and one suburban location
- Include at least one high-volume and one moderate-volume location
- Avoid including locations from the same regional manager
Wave 2: All remaining Tier 1 + Tier 2 locations (typically 5β8 locations)
Wave 3: Tier 3 locations with any identified remediation completed
Remediation Track: Tier 4 locationsβcreate specific remediation plans before scheduling for deployment
4. Rollout Strategy
Wave Structure Recommendation
Wave 1: Pilot (Weeks 4β6)
2β3 Locations | 3 weeks duration
Selection Criteria for Wave 1 Pilot Locations
| Criterion | Weight | Rationale |
|---|---|---|
| High composite readiness score (Tier 1) | Required | Maximizes success probability |
| Representative patient demographics | High | Learnings should apply to other locations |
| Geographically accessible to central team | Medium | Enables rapid on-site support |
| Vocal, engaged office manager | High | Will provide honest feedback |
| Mix of practice types (GP, specialty if applicable) | Medium | Tests different use cases |
| Not your "flagship" location | Medium | Lower visibility if issues arise |
β οΈ Wave 1 Anti-Patterns to Avoid
- Selecting only your highest-performing locations (creates false positive)
- Selecting locations with the same regional manager (limits perspective)
- Selecting locations currently undergoing other major changes (PMS upgrade, provider transition, renovation)
Wave 2: Expansion (Weeks 7β10)
5β8 Locations | 4 weeks duration
- All remaining Tier 1 locations
- Tier 2 locations with no identified blockers
- Begin geographic clustering (multiple locations in same region for efficient support)
Wave 3: Full Deployment (Weeks 11β16)
Remaining Locations | 6 weeks duration
- All Tier 3 locations
- Tier 4 locations that have completed remediation
- May run as multiple sub-waves for very large DSOs
Wave 4 (If Needed): Remediation Locations (Weeks 17+)
- Tier 4 locations requiring significant work
- New acquisitions not yet assessed
Timeline Per Wave
WAVE 1: PILOT (3 WEEKS)
βββ Week 1: Configuration, integration, champion training
βββ Week 2: Soft launch (staff + select patients), daily check-ins
βββ Week 3: Full launch, intensive monitoring, feedback capture
βββ Wave completion: Document learnings, update playbook
[1-WEEK BUFFER FOR LEARNING CAPTURE AND WAVE 2 PREP]
WAVE 2: EXPANSION (4 WEEKS)
βββ Week 1: Configuration & integration (parallelized)
βββ Week 2: Champion training, soft launch begins
βββ Week 3: Full launch, location-level support
βββ Week 4: Stabilization, monitoring transition to steady-state
βββ Wave completion: Refine playbook, prepare Wave 3
[1-WEEK BUFFER]
WAVE 3: FULL DEPLOYMENT (6 WEEKS)
βββ Weeks 1-2: Configuration & integration
βββ Weeks 3-4: Training and soft launch
βββ Weeks 5-6: Full launch and stabilization
π£ Go/No-Go Criteria to Advance Between Waves
| Criterion | Threshold | Data Source |
|---|---|---|
| Technical stability | <3 critical bugs unresolved | Issue tracker |
| Integration reliability | >99% uptime, data sync accurate | System monitoring |
| Staff proficiency | 80%+ of trained staff can complete core workflows | Training assessment |
| Patient enrollment success | >10 members enrolled per pilot location | BoomCloud dashboard |
| Patient experience | No significant complaints, <2% enrollment abandonment | Feedback log |
| Champion confidence | Champions rate readiness 4+/5 for expansion | Champion survey |
| Financial tracking | Revenue reconciliation accurate | Finance validation |
Decision Process:
- Day 14 of each wave: Central team compiles go/no-go scorecard
- Day 15: Go/no-go decision meeting (VP Ops + Regional Managers + CDO)
- If NO-GO: Identify specific blockers, create remediation plan, delay next wave 1β2 weeks
- If GO with conditions: Proceed but add specific monitoring for flagged areas
β οΈ Rollback Plan
Trigger Conditions for Rollback
- Critical system outage lasting >4 hours
- Data integrity issues (incorrect charges, lost enrollments)
- Integration failure causing PMS disruption
- Patient-facing errors affecting >10% of interactions
- Staff unable to complete core workflows after training
Rollback Procedure
| Step | Action | Owner | Timeline |
|---|---|---|---|
| 1 | Central team declares rollback | VP Ops | Immediate |
| 2 | π΅ Notify BoomCloud support of rollback | IT Lead | Within 1 hour |
| 3 | Disable BoomCloud patient-facing elements | IT Lead | Within 2 hours |
| 4 | Communicate to affected locations | Regional Manager | Within 2 hours |
| 5 | Revert to manual enrollment tracking (if any enrollments exist) | Office Manager | Same day |
| 6 | Root cause analysis initiated | IT Lead + Vendor | Within 24 hours |
| 7 | Stakeholder briefing on rollback | VP Ops | Within 24 hours |
| 8 | Remediation plan developed | IT Lead + Vendor | Within 72 hours |
| 9 | π£ Decision to resume rollout | VP Ops + C-Suite | After remediation complete |
Rollback Does NOT Mean:
- Complete project cancellation
- Removal of already-enrolled members (maintain their records offline)
- Blame assignmentβfocus on systematic learning
5. Configuration & Integration (Weeks 2β3)
Step-by-Step PMS Integration
Dentrix Integration
| Step | Action | Duration | Owner |
|---|---|---|---|
| 1 | Verify Dentrix version (G6.2 or higher required) | 15 min | IT |
| 2 | π΅ Download BoomCloud Dentrix connector from vendor portal | 10 min | IT |
| 3 | Install connector on server (requires Dentrix admin access) | 30 min | IT |
| 4 | π΅ Obtain API credentials from BoomCloud | 10 min | Vendor |
| 5 | Configure connection in BoomCloud admin portal | 20 min | IT |
| 6 | β οΈ Map fee schedulesβensure BoomCloud discount codes align with Dentrix adjustment types | 45 min | Office Mgr + IT |
| 7 | Run test syncβverify patient data flows correctly | 30 min | IT |
| 8 | Test enrollment workflow end-to-end | 30 min | Office Mgr |
| 9 | Verify transaction posting in Dentrix | 15 min | Office Mgr |
Eaglesoft Integration
| Step | Action | Duration | Owner |
|---|---|---|---|
| 1 | Verify Eaglesoft version (21 or higher required) | 15 min | IT |
| 2 | β οΈ Enable API access in Eaglesoft (requires Patterson support if not already enabled) | 1β3 days | IT + Patterson |
| 3 | π΅ Request Eaglesoft API credentials from BoomCloud | 10 min | Vendor |
| 4 | Configure OAuth connection in BoomCloud | 30 min | IT |
| 5 | Map provider IDs between systems | 30 min | Office Mgr + IT |
| 6 | Configure fee schedule mappings | 45 min | Office Mgr + IT |
| 7 | Test patient record sync | 30 min | IT |
| 8 | Test enrollment and benefit application | 30 min | Office Mgr |
Open Dental Integration
| Step | Action | Duration | Owner |
|---|---|---|---|
| 1 | Verify Open Dental version (21.1 or higher) | 15 min | IT |
| 2 | Enable Open Dental API (Service Manager β API) | 15 min | IT |
| 3 | Create API user with appropriate permissions | 20 min | IT |
| 4 | π΅ Configure BoomCloud Open Dental connection | 30 min | Vendor + IT |
| 5 | Map insurance plan types (member plan as discount plan) | 30 min | Office Mgr |
| 6 | Configure benefit patterns | 30 min | Office Mgr |
| 7 | Test patient sync and enrollment | 30 min | IT + Office Mgr |
Payment System Integration
| Step | Action | Duration | Owner |
|---|---|---|---|
| 1 | π£ Decide: Centralized merchant account vs. per-location | Decision | CFO |
| 2 | π΅ Create Stripe Connect account (if centralized) or individual accounts | 1β3 days | Finance + Vendor |
| 3 | Complete Stripe identity verification for each connected account | 1β2 days per location | Finance |
| 4 | Configure payment split (if any revenue sharing with locations) | 30 min | Finance |
| 5 | Test payment processing with test cards | 30 min | IT |
| 6 | β οΈ Verify funds disbursement to correct bank accounts | 3β5 days | Finance |
| 7 | Configure refund policies and permissions | 30 min | Finance |
Test Environment Setup
β π΅ Request BoomCloud sandbox environment access β Create test location in BoomCloud (mirror production configuration) β Create test patient records in PMS test environment (or use training database) β Configure payment processor in test mode β Document test scenarios (see validation checklist below)
Validation Checklist
| Test Case | Expected Result | Pass/Fail | Notes |
|---|---|---|---|
| Create new member enrollment | Member created in BoomCloud, patient flagged in PMS | β | |
| Process initial payment | Payment successful, receipt generated, funds pending | β | |
| Apply member discount to treatment | Discount auto-calculates in PMS | β | |
| Trigger recurring billing | Monthly payment processes on schedule | β | |
| Cancel membership | Member status updated, benefits terminated, PMS updated | β | |
| Generate member ID card | PDF generated, emailable | β | |
| Pull location dashboard report | All enrolled members display, revenue accurate | β | |
| Escalate failed payment | Dunning email sent, status flagged | β |
Data Migration (If Applicable)
If locations have existing in-house discount/membership programs:
| Step | Action | Duration | Owner |
|---|---|---|---|
| 1 | Export existing member list from spreadsheets/PMS | 2 hours/location | Office Mgr |
| 2 | Standardize data format to BoomCloud import template | 2 hours/location | Central team |
| 3 | β οΈ Verify billing information is current (expired cards, old addresses) | 3 hours/location | Office Mgr |
| 4 | Decide: Migrate as "grandfathered" members or require re-enrollment? | Decision | VP Ops |
| 5 | π΅ Bulk import members via BoomCloud import tool | 1 hour/location | IT + Vendor |
| 6 | Communicate with existing members about transition | 1 week notice | Office Mgr |
| 7 | Validate migrated records | 1 hour/location | Office Mgr |
Security and HIPAA Compliance Verification
Enterprise-Level HIPAA Checklist
| Item | Status | Evidence Required | Owner |
|---|---|---|---|
| π΅ Business Associate Agreement (BAA) executed | β | Signed BAA on file | Legal |
| BoomCloud SOC 2 Type II certification verified | β | Current audit report | IT Security |
| Data encryption at rest confirmed | β | Vendor attestation | IT Security |
| Data encryption in transit (TLS 1.2+) confirmed | β | Certificate verification | IT Security |
| Access logging enabled | β | Log configuration screenshot | IT |
| User access controls configured (role-based) | β | Role matrix documented | IT |
| Data retention policy aligned with org policy | β | Policy comparison | Compliance |
| Breach notification procedures documented | β | Procedure document | Legal/Compliance |
| Workforce training on PHI handling with BoomCloud | β | Training record | HR |
| Minimum necessary access principle applied | β | Access audit | IT |
Access Control Matrix
| Role | View Patient Data | Enroll Members | Process Payments | Access Reports | Modify Config |
|---|---|---|---|---|---|
| Org Admin | β (All) | β | β | β (All) | β |
| Regional Admin | β (Region) | β | β | β (Region) | Limited |
| Location Admin | β (Location) | β | β | β (Location) | Limited |
AI-generated implementation guide based on public vendor information. Verify specifics directly with BoomCloud.