1. Executive Summary

What BoomCloud Does

BoomCloud is a membership plan management platform that enables dental organizations to create, sell, and manage in-house membership plans for uninsured patients while providing patient financing solutions. The platform automates recurring billing, tracks member benefits, integrates with practice management systems, and provides real-time analytics on membership revenue across locations.

Why DSOs Benefit from Membership & Patient Financing AI

DSOs operating at scale face a significant strategic challenge: uninsured patients represent 50%+ of the population, yet most practices lack a systematic approach to capture this revenue. BoomCloud addresses this through:

  • Standardization at Scale: Deploy a unified membership model across 15–50 locations rather than managing disparate, manually-tracked "in-house discount plans" that vary by location and create compliance exposure
  • Centralized Revenue Visibility: Real-time dashboards aggregate membership recurring revenue (MRR) across the entire organization, enabling accurate forecasting and board reporting
  • Data-Driven Pricing Optimization: Cross-location data enables sophisticated analysis of pricing elasticity, plan tier performance, and regional variations that single practices cannot achieve
  • Reduced Administrative Burden: Automation of billing, renewals, and benefit tracking eliminates 10-15 hours/week of manual work per location currently spent managing spreadsheet-based discount programs
  • Patient Retention Leverage: Members demonstrate 2-3x higher case acceptance rates and significantly lower attritionβ€”a multiplier effect when applied across 15+ locations

Expected Timeline: Decision to Full Deployment

Phase Duration Milestone
Pre-Implementation Weeks 1–2 Contracts signed, baseline metrics captured, stakeholder alignment complete
Configuration & Integration Weeks 2–3 PMS integrations live, test environment validated
Wave 1 Pilot (2–3 locations) Weeks 4–6 Pilot locations fully operational, initial learnings captured
Wave 2 Expansion (5–8 locations) Weeks 7–10 Second wave deployed, playbook refined
Wave 3+ Full Rollout Weeks 11–16 All remaining locations live
Post-Launch Optimization Weeks 17–24 Full optimization cycle complete, ROI validated

Total Timeline: 16–24 weeks for full deployment across 15–50 locations


2. Pre-Implementation Checklist (Weeks 1–2)

Technical Requirements

Hardware Requirements

☐ Workstations at each location with minimum specs: Windows 10/11 or macOS 10.15+, 4GB RAM, modern browser (Chrome, Edge, or Safari) ☐ Tablet devices for patient-facing enrollment (optional but recommended): iPad or Android tablet with 10"+ screen ☐ Receipt/card printers if in-office payment processing is required

Software Requirements

☐ Practice Management System: Dentrix (G6.2+), Eaglesoft (21+), Open Dental (21.1+), Denticon, or other supported PMS ☐ Modern web browser updated to current version ☐ PDF reader for patient agreements and documentation ☐ Email system for automated member communications

Network Requirements

☐ Minimum 25 Mbps download / 5 Mbps upload per location ☐ Stable internet connection with <100ms latency to BoomCloud servers ☐ HTTPS/TLS 1.2+ capability for secure data transmission ☐ Port 443 open for outbound connections

Integration Requirements

☐ Verify PMS version compatibility with BoomCloud API ☐ Confirm payment processor compatibility (Stripe is primary; verify alternatives) ☐ Identify patient communication system (email, SMS) for integration

Vendor Onboarding Steps

Step Owner Timeline Notes
πŸ”΅ Execute enterprise agreement and BAA Legal / Vendor Day 1–3 Ensure multi-location pricing is optimized
πŸ”΅ Assign dedicated BoomCloud Customer Success Manager (CSM) Vendor Day 3 Request enterprise-tier CSM with DSO experience
πŸ”΅ Schedule kick-off call with BoomCloud implementation team Operations Lead Day 4–5 Include IT lead and 1-2 regional managers
πŸ”΅ Obtain access to BoomCloud Academy training resources Vendor Day 5 Confirm unlimited seat licenses for training
πŸ”΅ Establish support escalation contacts and SLAs Vendor / IT Day 5–7 Document Tier 1, 2, 3 support paths

Key Vendor Contacts to Establish

Role Purpose Contact Method
Customer Success Manager Strategic guidance, business reviews Direct email/phone
Technical Implementation Specialist Integration, configuration Slack/email
Tier 1 Support Day-to-day issues Support portal/chat
Tier 2 Support Complex technical issues Escalation from Tier 1
Account Executive Contract modifications, expansion Direct email

Data/Access Prerequisites

☐ Admin login credentials for each location's PMS ☐ πŸ”΅ API keys or service account credentials (request from PMS vendor if needed) ☐ Patient data export permissions for historical analysis ☐ Access to existing membership/discount plan documentation (if any) ☐ Payment processor merchant account credentials ☐ Email sending domain DNS access (for SPF/DKIM configuration)

Internal Stakeholder Alignment

🟣 Who Needs to Approve

Stakeholder Approval Required For Timeline
CEO/Board Investment decision, strategic alignment Before Week 1
CFO Budget allocation, ROI targets, pricing strategy Before Week 1
Chief Dental Officer Clinical plan structure, benefit levels Week 1
VP of Operations Implementation timeline, resource allocation Week 1
General Counsel BAA, patient agreement templates, compliance Week 1
CTO/IT Director Technical architecture, security review Week 1

Who Needs to Be Informed

Stakeholder Communication Need Channel
Regional Managers Rollout timeline, location selection, their role Regional manager briefing (see Section 7)
Office Managers What's coming, how it affects their location Email + regional manager cascade
Providers Clinical rationale, patient conversation changes CDO communication
Front Desk Staff New workflow introduction Office manager cascade
Billing Staff Revenue recognition changes Finance lead communication

Baseline Metrics to Capture BEFORE Go-Live

⚠️ Critical: Capture these metrics consistently across ALL locations before any rollout begins. Inconsistent baseline measurement is the #1 reason DSOs cannot demonstrate ROI post-implementation.

Revenue & Patient Metrics

Metric Definition Data Source Capture Method
Uninsured patient % Patients with no dental insurance / total active patients PMS Standardized report
Uninsured patient revenue Revenue from uninsured patients (12-month trailing) PMS + Accounting Manual calculation
Current discount plan enrollment Patients on any in-house discount plan PMS or spreadsheet Manual count
Case acceptance rate (uninsured) Accepted treatment value / presented treatment value for uninsured patients PMS Standardized report
Average treatment value (uninsured) Mean revenue per uninsured patient visit PMS Standardized report
Patient attrition rate Patients who haven't visited in 18+ months / total patients PMS Standardized report

Operational Metrics

Metric Definition Data Source Capture Method
Time spent managing discount plans Hours/week staff spend on manual tracking Office manager survey Survey
Patient financing utilization % of large cases using third-party financing PMS + financing vendor Manual count
Accounts receivable (uninsured) Outstanding patient balances >30 days PMS Standardized report
Plan renewal rate (If existing plans) Renewals / total up for renewal Manual tracking Spreadsheet

⚠️ Standardization Protocol for Baseline Metrics

  1. Create standardized report templates in each PMS variant used across the organization
  2. Define the measurement period: Use the same 12-month lookback window for all locations
  3. Assign metric capture to a single owner (recommend: central finance or operations analyst)
  4. Validate data quality before acceptingβ€”flag locations with incomplete data
  5. Store baselines in a central repository (SharePoint, Google Drive, or BI tool)
  6. Document any location-specific anomalies (e.g., "Location #12 had 2 months of PMS migrationβ€”data incomplete")

Enterprise-Level Requirements

Network Standards Across Locations

☐ Audit internet speeds at all locationsβ€”flag any below 25 Mbps ☐ Verify firewall configurations allow BoomCloud domains (*.boomcloudapps.com) ☐ Confirm VPN configurations (if used) don't block required connections ☐ Document network provider and contact for each location

Centralized vs. Location-Level Hosting Decision

Recommendation: Cloud-hosted (SaaS) with centralized admin and location-level access

BoomCloud is a cloud-native platformβ€”no on-premise hosting decision required. However, you must decide:

Decision Recommendation Rationale
Admin hierarchy Centralized master admin β†’ Regional admin β†’ Location admin Enables standardization while allowing regional customization
Payment processing Centralized merchant account Simplified reconciliation, better rates, reduced fraud risk
Data access Centralized reporting dashboard with location-level drill-down Essential for portfolio-level visibility

Single Sign-On (SSO) Configuration

☐ πŸ”΅ Confirm BoomCloud SSO compatibility with your identity provider (Okta, Azure AD, Google Workspace) ☐ Provide IdP metadata to BoomCloud implementation team ☐ Test SSO authentication before rollout ☐ Document SSO setup for IT knowledge base

Centralized Credentialing

☐ Establish user role taxonomy:

  • Org Admin: Full access, configuration, reporting across all locations
  • Regional Admin: Access to assigned region's locations
  • Location Admin: Access to single location, limited configuration
  • Staff User: Transaction and enrollment access only
  • Read-Only: Reporting access only ☐ Define credential provisioning workflow (who creates accounts, approval process) ☐ Define credential deprovisioning workflow (termination process)

Stakeholder Alignment Map

β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                         BOARD / INVESTORS                          β”‚
β”‚  Need: ROI justification, competitive positioning, growth story    β”‚
β”‚  Touchpoint: Quarterly board update, pre-decision approval         β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜
                                    β”‚
                                    β–Ό
β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                            C-SUITE                                  β”‚
β”‚  CEO: Strategic alignment | CFO: Financial model | CDO: Clinical   β”‚
β”‚  COO/VP Ops: Owns implementation | CTO: Technical approval         β”‚
β”‚  Touchpoint: Weekly implementation steering committee               β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜
                                    β”‚
                                    β–Ό
β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                        REGIONAL MANAGERS                            β”‚
β”‚  Need: Timeline, location selection rationale, their role          β”‚
β”‚  Touchpoint: Bi-weekly rollout status calls, wave planning         β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜
                                    β”‚
                                    β–Ό
β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                    LOCATION OFFICE MANAGERS                         β”‚
β”‚  Need: What's changing, training schedule, go-live date            β”‚
β”‚  Touchpoint: Regional manager cascade, champion training           β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜
                                    β”‚
                                    β–Ό
β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”
β”‚                          PROVIDERS                                  β”‚
β”‚  Need: Why this matters, patient conversation changes, support     β”‚
β”‚  Touchpoint: CDO communication, champion-led training              β”‚
β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜

3. Location Readiness Assessment

Scoring Framework

Score each factor from 1 (lowest readiness) to 5 (highest readiness) for every location.

Factor 1: IT Infrastructure Maturity

Score Network Speed Hardware Age PMS Version Description
5 >100 Mbps <2 years Current Enterprise-grade infrastructure
4 50–100 Mbps 2–3 years Current-1 Strong infrastructure with minor gaps
3 25–50 Mbps 3–4 years Current-2 Adequate but may need updates
2 10–25 Mbps 4–5 years Current-3 Significant infrastructure gaps
1 <10 Mbps >5 years >Current-3 Major infrastructure remediation needed

Factor 2: Staff Tenure and Adaptability

Score Staff Turnover (Annual) Tech Comfort Training History Description
5 <15% High Completed 2+ tech implementations Stable, tech-savvy team
4 15–25% Above average Completed 1 tech implementation Good adaptability
3 25–35% Average Some tech training Typical adaptability
2 35–50% Below average Minimal training history May struggle with adoption
1 >50% Low No recent training High risk for adoption challenges

Factor 3: Patient Volume

Score Monthly Patient Visits Impact Potential Risk Level Description
5 500–700 Very high Moderate Optimal volumeβ€”high impact, manageable
4 700–900 High Moderate-high Good candidate with close monitoring
3 300–500 Moderate Low-moderate Lower risk but lower impact
2 >900 Very high High May overwhelm staff during transition
1 <300 Low Low Limited ROI potential

Factor 4: Tech Stack Compatibility

Score PMS Payment Integration Prior BoomCloud Use Description
5 Tier 1 (Dentrix, Eaglesoft, Open Dental) + current version Stripe Yes Fully compatible
4 Tier 1 + current-1 version Stripe or compatible No Highly compatible
3 Tier 1 + older version OR Tier 2 PMS Some compatibility work No Compatible with configuration
2 Tier 2 PMS + older version Manual workaround needed No Requires significant integration work
1 Legacy/unsupported PMS Incompatible No Integration not feasible without PMS upgrade

Factor 5: Local Champion Availability

Score Champion Available Champion Profile Description
5 Yes Tech-forward dentist + engaged office manager Ideal champion pairing
4 Yes Either tech-forward provider OR strong office manager Good champion potential
3 Potential Staff member with interest but unproven Champion development needed
2 Uncertain No clear candidate identified Will need external champion support
1 No Staff resistant, no leadership support Champion must be assigned from regional team

Composite Readiness Score Calculation

Composite Score = (IT Γ— 1.0) + (Staff Γ— 1.5) + (Volume Γ— 1.0) + (Tech Stack Γ— 1.5) + (Champion Γ— 2.0)

Composite Score Readiness Tier Rollout Recommendation
28–35 Tier 1 (High Readiness) Wave 1 candidate
21–27 Tier 2 (Moderate-High) Wave 2 candidate
14–20 Tier 3 (Moderate) Wave 3 candidate
7–13 Tier 4 (Low) Requires remediation before rollout

Sample Location Readiness Matrix

Location IT (Γ—1.0) Staff (Γ—1.5) Volume (Γ—1.0) Tech (Γ—1.5) Champion (Γ—2.0) Composite Tier
Springfield 4 4 (6) 5 5 (7.5) 5 (10) 32.5 Tier 1
Riverside 5 5 (7.5) 4 4 (6) 4 (8) 30.5 Tier 1
Oakwood 3 3 (4.5) 3 4 (6) 3 (6) 22.5 Tier 2
Lakeside 2 2 (3) 2 3 (4.5) 2 (4) 15.5 Tier 3
Downtown 1 1 (1.5) 4 2 (3) 1 (2) 11.5 Tier 4

Wave 1 (Pilot): Select 2–3 locations from Tier 1 that also represent portfolio diversity:

  • Include at least one urban and one suburban location
  • Include at least one high-volume and one moderate-volume location
  • Avoid including locations from the same regional manager

Wave 2: All remaining Tier 1 + Tier 2 locations (typically 5–8 locations)

Wave 3: Tier 3 locations with any identified remediation completed

Remediation Track: Tier 4 locationsβ€”create specific remediation plans before scheduling for deployment


4. Rollout Strategy

Wave Structure Recommendation

Wave 1: Pilot (Weeks 4–6)

2–3 Locations | 3 weeks duration

Selection Criteria for Wave 1 Pilot Locations

Criterion Weight Rationale
High composite readiness score (Tier 1) Required Maximizes success probability
Representative patient demographics High Learnings should apply to other locations
Geographically accessible to central team Medium Enables rapid on-site support
Vocal, engaged office manager High Will provide honest feedback
Mix of practice types (GP, specialty if applicable) Medium Tests different use cases
Not your "flagship" location Medium Lower visibility if issues arise

⚠️ Wave 1 Anti-Patterns to Avoid

  • Selecting only your highest-performing locations (creates false positive)
  • Selecting locations with the same regional manager (limits perspective)
  • Selecting locations currently undergoing other major changes (PMS upgrade, provider transition, renovation)

Wave 2: Expansion (Weeks 7–10)

5–8 Locations | 4 weeks duration

  • All remaining Tier 1 locations
  • Tier 2 locations with no identified blockers
  • Begin geographic clustering (multiple locations in same region for efficient support)

Wave 3: Full Deployment (Weeks 11–16)

Remaining Locations | 6 weeks duration

  • All Tier 3 locations
  • Tier 4 locations that have completed remediation
  • May run as multiple sub-waves for very large DSOs

Wave 4 (If Needed): Remediation Locations (Weeks 17+)

  • Tier 4 locations requiring significant work
  • New acquisitions not yet assessed

Timeline Per Wave

WAVE 1: PILOT (3 WEEKS)
β”œβ”€β”€ Week 1: Configuration, integration, champion training
β”œβ”€β”€ Week 2: Soft launch (staff + select patients), daily check-ins
└── Week 3: Full launch, intensive monitoring, feedback capture
    └── Wave completion: Document learnings, update playbook

[1-WEEK BUFFER FOR LEARNING CAPTURE AND WAVE 2 PREP]

WAVE 2: EXPANSION (4 WEEKS)
β”œβ”€β”€ Week 1: Configuration & integration (parallelized)
β”œβ”€β”€ Week 2: Champion training, soft launch begins
β”œβ”€β”€ Week 3: Full launch, location-level support
└── Week 4: Stabilization, monitoring transition to steady-state
    └── Wave completion: Refine playbook, prepare Wave 3

[1-WEEK BUFFER]

WAVE 3: FULL DEPLOYMENT (6 WEEKS)
β”œβ”€β”€ Weeks 1-2: Configuration & integration
β”œβ”€β”€ Weeks 3-4: Training and soft launch
└── Weeks 5-6: Full launch and stabilization

🟣 Go/No-Go Criteria to Advance Between Waves

Criterion Threshold Data Source
Technical stability <3 critical bugs unresolved Issue tracker
Integration reliability >99% uptime, data sync accurate System monitoring
Staff proficiency 80%+ of trained staff can complete core workflows Training assessment
Patient enrollment success >10 members enrolled per pilot location BoomCloud dashboard
Patient experience No significant complaints, <2% enrollment abandonment Feedback log
Champion confidence Champions rate readiness 4+/5 for expansion Champion survey
Financial tracking Revenue reconciliation accurate Finance validation

Decision Process:

  1. Day 14 of each wave: Central team compiles go/no-go scorecard
  2. Day 15: Go/no-go decision meeting (VP Ops + Regional Managers + CDO)
  3. If NO-GO: Identify specific blockers, create remediation plan, delay next wave 1–2 weeks
  4. If GO with conditions: Proceed but add specific monitoring for flagged areas

⚠️ Rollback Plan

Trigger Conditions for Rollback

  • Critical system outage lasting >4 hours
  • Data integrity issues (incorrect charges, lost enrollments)
  • Integration failure causing PMS disruption
  • Patient-facing errors affecting >10% of interactions
  • Staff unable to complete core workflows after training

Rollback Procedure

Step Action Owner Timeline
1 Central team declares rollback VP Ops Immediate
2 πŸ”΅ Notify BoomCloud support of rollback IT Lead Within 1 hour
3 Disable BoomCloud patient-facing elements IT Lead Within 2 hours
4 Communicate to affected locations Regional Manager Within 2 hours
5 Revert to manual enrollment tracking (if any enrollments exist) Office Manager Same day
6 Root cause analysis initiated IT Lead + Vendor Within 24 hours
7 Stakeholder briefing on rollback VP Ops Within 24 hours
8 Remediation plan developed IT Lead + Vendor Within 72 hours
9 🟣 Decision to resume rollout VP Ops + C-Suite After remediation complete

Rollback Does NOT Mean:

  • Complete project cancellation
  • Removal of already-enrolled members (maintain their records offline)
  • Blame assignmentβ€”focus on systematic learning

5. Configuration & Integration (Weeks 2–3)

Step-by-Step PMS Integration

Dentrix Integration

Step Action Duration Owner
1 Verify Dentrix version (G6.2 or higher required) 15 min IT
2 πŸ”΅ Download BoomCloud Dentrix connector from vendor portal 10 min IT
3 Install connector on server (requires Dentrix admin access) 30 min IT
4 πŸ”΅ Obtain API credentials from BoomCloud 10 min Vendor
5 Configure connection in BoomCloud admin portal 20 min IT
6 ⚠️ Map fee schedulesβ€”ensure BoomCloud discount codes align with Dentrix adjustment types 45 min Office Mgr + IT
7 Run test syncβ€”verify patient data flows correctly 30 min IT
8 Test enrollment workflow end-to-end 30 min Office Mgr
9 Verify transaction posting in Dentrix 15 min Office Mgr

Eaglesoft Integration

Step Action Duration Owner
1 Verify Eaglesoft version (21 or higher required) 15 min IT
2 ⚠️ Enable API access in Eaglesoft (requires Patterson support if not already enabled) 1–3 days IT + Patterson
3 πŸ”΅ Request Eaglesoft API credentials from BoomCloud 10 min Vendor
4 Configure OAuth connection in BoomCloud 30 min IT
5 Map provider IDs between systems 30 min Office Mgr + IT
6 Configure fee schedule mappings 45 min Office Mgr + IT
7 Test patient record sync 30 min IT
8 Test enrollment and benefit application 30 min Office Mgr

Open Dental Integration

Step Action Duration Owner
1 Verify Open Dental version (21.1 or higher) 15 min IT
2 Enable Open Dental API (Service Manager β†’ API) 15 min IT
3 Create API user with appropriate permissions 20 min IT
4 πŸ”΅ Configure BoomCloud Open Dental connection 30 min Vendor + IT
5 Map insurance plan types (member plan as discount plan) 30 min Office Mgr
6 Configure benefit patterns 30 min Office Mgr
7 Test patient sync and enrollment 30 min IT + Office Mgr

Payment System Integration

Step Action Duration Owner
1 🟣 Decide: Centralized merchant account vs. per-location Decision CFO
2 πŸ”΅ Create Stripe Connect account (if centralized) or individual accounts 1–3 days Finance + Vendor
3 Complete Stripe identity verification for each connected account 1–2 days per location Finance
4 Configure payment split (if any revenue sharing with locations) 30 min Finance
5 Test payment processing with test cards 30 min IT
6 ⚠️ Verify funds disbursement to correct bank accounts 3–5 days Finance
7 Configure refund policies and permissions 30 min Finance

Test Environment Setup

☐ πŸ”΅ Request BoomCloud sandbox environment access ☐ Create test location in BoomCloud (mirror production configuration) ☐ Create test patient records in PMS test environment (or use training database) ☐ Configure payment processor in test mode ☐ Document test scenarios (see validation checklist below)

Validation Checklist

Test Case Expected Result Pass/Fail Notes
Create new member enrollment Member created in BoomCloud, patient flagged in PMS ☐
Process initial payment Payment successful, receipt generated, funds pending ☐
Apply member discount to treatment Discount auto-calculates in PMS ☐
Trigger recurring billing Monthly payment processes on schedule ☐
Cancel membership Member status updated, benefits terminated, PMS updated ☐
Generate member ID card PDF generated, emailable ☐
Pull location dashboard report All enrolled members display, revenue accurate ☐
Escalate failed payment Dunning email sent, status flagged ☐

Data Migration (If Applicable)

If locations have existing in-house discount/membership programs:

Step Action Duration Owner
1 Export existing member list from spreadsheets/PMS 2 hours/location Office Mgr
2 Standardize data format to BoomCloud import template 2 hours/location Central team
3 ⚠️ Verify billing information is current (expired cards, old addresses) 3 hours/location Office Mgr
4 Decide: Migrate as "grandfathered" members or require re-enrollment? Decision VP Ops
5 πŸ”΅ Bulk import members via BoomCloud import tool 1 hour/location IT + Vendor
6 Communicate with existing members about transition 1 week notice Office Mgr
7 Validate migrated records 1 hour/location Office Mgr

Security and HIPAA Compliance Verification

Enterprise-Level HIPAA Checklist

Item Status Evidence Required Owner
πŸ”΅ Business Associate Agreement (BAA) executed ☐ Signed BAA on file Legal
BoomCloud SOC 2 Type II certification verified ☐ Current audit report IT Security
Data encryption at rest confirmed ☐ Vendor attestation IT Security
Data encryption in transit (TLS 1.2+) confirmed ☐ Certificate verification IT Security
Access logging enabled ☐ Log configuration screenshot IT
User access controls configured (role-based) ☐ Role matrix documented IT
Data retention policy aligned with org policy ☐ Policy comparison Compliance
Breach notification procedures documented ☐ Procedure document Legal/Compliance
Workforce training on PHI handling with BoomCloud ☐ Training record HR
Minimum necessary access principle applied ☐ Access audit IT

Access Control Matrix

Role View Patient Data Enroll Members Process Payments Access Reports Modify Config
Org Admin βœ“ (All) βœ“ βœ“ βœ“ (All) βœ“
Regional Admin βœ“ (Region) βœ“ βœ“ βœ“ (Region) Limited
Location Admin βœ“ (Location) βœ“ βœ“ βœ“ (Location) Limited

AI-generated implementation guide based on public vendor information. Verify specifics directly with BoomCloud.