Step-by-step implementation guide β pre-implementation checklist, onboarding, staff training, go-live runbook, and ROI tracking.
Glidewell β Implementation Playbook (DSO)
Glidewell 3D Printing & Digital Workflow Implementation Playbook
A Strategic Guide for DSO Deployment
1. Executive Summary
What This Tool Does
Glidewell's 3D Printing & Digital Workflow solution integrates chairside and laboratory digital manufacturing capabilitiesβincluding the glidewell.ioβ’ In-Office Solution, fastmill.ioβ’, and advanced 3D printing systemsβenabling DSOs to produce same-day restorations, surgical guides, dentures, and orthodontic appliances in-house while maintaining seamless digital connectivity with Glidewell's laboratory network for complex cases.
Why DSOs Specifically Benefit
Scale Advantages:
- Bulk equipment purchasing and consumables negotiation across 15β50 locations dramatically reduces per-unit costs
- Centralized digital design capabilities can support multiple locations, maximizing ROI on trained CAD/CAM specialists
- Standardized material inventories reduce waste and enable cross-location resource sharing
Standardization Benefits:
- Unified digital impression protocols eliminate variability in case quality across providers
- Consistent restoration parameters ensure brand-level quality standards regardless of location
- Standardized workflows enable staff portability between locations
Data Aggregation Value:
- Enterprise-wide production analytics reveal efficiency patterns and bottlenecks
- Predictive material ordering based on aggregated case volume data
- Comparative performance benchmarking across locations and providers
Expected Timeline: Decision to Full Deployment
| Phase | Duration | Milestone |
|---|---|---|
| Pre-Implementation | Weeks 1β2 | Infrastructure assessment, vendor contracts, baseline metrics |
| Pilot Wave (2β3 locations) | Weeks 3β8 | Full deployment and optimization at pilot sites |
| Wave 2 (5β8 locations) | Weeks 9β14 | Scaled deployment with refined playbook |
| Wave 3+ (Remaining locations) | Weeks 15β26 | Full portfolio deployment |
| Total Timeline | 6β7 months | All 15β50 locations operational |
Note: Timeline assumes 30-location DSO. Adjust proportionally for portfolio size.
2. Pre-Implementation Checklist (Weeks 1β2)
Technical Requirements
Hardware Requirements
β Milling/Printing Equipment Specifications
- glidewell.io: Dedicated space minimum 4' x 3', 110V/20A dedicated circuit
- fastmill.io: Minimum 3' x 2.5' space, 110V/15A circuit
- 3D Printers: Ventilated area with temperature control (68β77Β°F), dedicated circuit
- Estimated time: 2 hours per location assessment
β Chairside Scanning Hardware
- iTero Element series, 3Shape TRIOS, or compatible intraoral scanner
- Dedicated scanning workstation with minimum 16GB RAM, SSD storage
- Calibration tools and maintenance kits
- Estimated time: 1 hour per operatory inventory
β Workstation Requirements
- Design station: Intel i7 or equivalent, 32GB RAM, dedicated GPU (NVIDIA recommended), dual monitors
- Windows 10/11 Pro (64-bit)
- Minimum 500GB SSD with 100GB free space
- Estimated time: 30 minutes per workstation audit
Network Requirements
β Bandwidth Standards
- Minimum 100 Mbps symmetric per location (recommended: 250+ Mbps)
- Dedicated VLAN for digital workflow equipment
- Latency <50ms to cloud services
- Estimated time: 4 hours network assessment across portfolio
β Firewall/Security Configuration
- Whitelist Glidewell cloud endpoints (obtain list from vendor)
- Open required ports for real-time case transmission
- VPN configuration for centralized design centers (if applicable)
- Estimated time: 2 hours per location IT configuration
Software Requirements
β Core Software Stack
- glidewell.io Design Software (latest version)
- Glidewell Direct cloud platform access
- CAD/CAM design software licenses
- 3D printing slicer software
- Estimated time: 1 hour per workstation installation
β Integration Software
- PMS integration middleware (Dentrix, Eaglesoft, Open Dental connectors)
- DICOM viewer for CBCT integration
- Cloud backup solution compatible with PHI
- Estimated time: 4β8 hours per integration configuration
π΅ Vendor Onboarding Steps
| Step | Action | Owner | Timeline |
|---|---|---|---|
| 1 | Execute Master Services Agreement (enterprise-level) | Legal/Procurement | Days 1β5 |
| 2 | π΅ Schedule Glidewell Implementation Kickoff Call | Vendor + VP Ops | Day 6 |
| 3 | π΅ Assign Glidewell Enterprise Account Manager | Vendor | Day 7 |
| 4 | π΅ Receive equipment delivery schedule by location | Vendor | Days 8β10 |
| 5 | π΅ Obtain technical support escalation matrix | Vendor | Day 10 |
| 6 | π΅ Confirm training calendar availability | Vendor | Days 10β14 |
Key Vendor Contacts to Establish
β Enterprise Account Manager (primary relationship owner) β Technical Implementation Specialist (equipment installation) β Integration Engineer (PMS/imaging connectivity) β Training Coordinator (scheduling and materials) β Tier 2 Technical Support Lead (escalation path) β Executive Sponsor (Glidewell side) for QBRs
Estimated time: 3β4 hours total coordination
Data/Access Prerequisites
β Glidewell Platform Access
- Enterprise admin account creation
- Location-level admin accounts (one per site)
- Provider-level user accounts
- API credentials for PMS integration
- Estimated time: 2 hours setup, 30 minutes per location
β Imaging Archive Access
- CBCT system export credentials
- Intraoral scanner cloud sync permissions
- Historical case database access (for training AI components)
- Estimated time: 1β2 hours per imaging system
β PMS Access Levels
- Read/write access for appointment integration
- Patient record query permissions
- Treatment plan modification rights
- Billing code automation permissions
- Estimated time: 1 hour per PMS instance
β οΈ Internal Stakeholder Alignment
π£ Approval Requirements
| Stakeholder | Approval Needed For | Timeline |
|---|---|---|
| Board/Investors | Capital expenditure >$X threshold, strategic initiative endorsement | Pre-decision |
| CEO/COO | Overall initiative approval, budget allocation | Week 1 |
| Chief Dental Officer | Clinical protocol changes, provider workflow modifications | Week 1 |
| VP of Operations | Rollout timeline, resource allocation, location selection | Week 1 |
| CFO | ROI projections, financing structure, depreciation schedule | Week 1 |
| VP of IT | Infrastructure requirements, security compliance, integration scope | Week 1β2 |
| Regional Managers | Location-specific considerations, staff readiness concerns | Week 2 |
| Office Managers (pilot sites) | Go-live scheduling, staff coordination | Week 2 |
Stakeholder Alignment Map
INFORM ββββββββββββββββββββββββββββββββ APPROVE
Board/Investors ββββββββββββββββββββββββββ Strategic approval + ROI reporting
CEO ββββββββββββββββββββββββββ Initiative approval + executive sponsorship
COO ββββββββββββββββββββββββββ Operational oversight + resource allocation
Chief Dental Officer ββββββββββββββββββββββββββ Clinical protocol approval + provider buy-in
CFO ββββββββββββββββββββββββββ Budget approval + financial tracking
VP of Operations ββββββββββββββββββββββββββ Primary owner + rollout execution
VP of IT ββββββββββββββββββββββββββ Technical approval + security sign-off
Regional Managers ββββββββββββββββββββββββββ Location coordination + staff management
Office Managers ββββββββββββββββββββββββββ Local execution + daily oversight
Providers ββββββββββββββββββββββββββ Clinical adoption + workflow feedback
Baseline Metrics to Capture BEFORE Go-Live
β οΈ Critical: Standardize Measurement Across All Locations
Production Metrics (capture 90-day historical average)
| Metric | How to Measure | Target Source |
|---|---|---|
| Same-day restoration volume | Cases completed same visit | PMS procedure codes |
| Average lab case turnaround | Days from impression to seat | Lab tracking system |
| Remake/adjustment rate | % cases requiring redo | Lab invoices + PMS |
| Chair time per restoration | Minutes per crown/bridge seat | Schedule analysis |
| Lab fees per restoration | Average cost per unit | Accounting/Lab invoices |
Financial Metrics
| Metric | How to Measure | Target Source |
|---|---|---|
| Revenue per provider hour | Production Γ· clinical hours | PMS + payroll |
| Lab expense as % of revenue | Lab costs Γ· restorative revenue | P&L by location |
| Average case value | Revenue per restorative case | PMS reporting |
| Restorative case acceptance rate | Accepted Γ· presented | PMS treatment plans |
Operational Metrics
| Metric | How to Measure | Target Source |
|---|---|---|
| Appointment cancellation rate | Cancelled Γ· scheduled | PMS scheduling |
| Patient wait time for restorations | Days to next available | Scheduling analysis |
| Referral-out rate for complex cases | Cases sent to specialists | PMS referral tracking |
| Staff overtime hours | Hours above 40/week | Payroll records |
Quality Metrics
| Metric | How to Measure | Target Source |
|---|---|---|
| Patient satisfaction scores | NPS or survey results | Patient feedback system |
| Clinical outcome complaints | Patient-reported issues | Call logs/reviews |
| Provider satisfaction | Internal survey | Staff survey tool |
β Create standardized baseline report template β Distribute to all Office Managers with 14-day completion deadline β Centralize data collection in single dashboard β Validate data quality before proceeding
Estimated time: 4β6 hours to design template, 2 hours per location to complete
Enterprise-Level Requirements
Network Standards Across Locations
β Standardized Network Architecture
- Consistent VLAN segmentation for clinical devices
- Uniform firewall rule sets for Glidewell connectivity
- Centralized network monitoring for all production equipment
- Redundant internet connections at high-volume locations
Hosting Decision Matrix
| Factor | Centralized Hosting | Location-Level Hosting |
|---|---|---|
| Design workload | Multiple designers serve all locations | Each location self-sufficient |
| Network dependency | High (requires reliable connectivity) | Low (local processing) |
| Staffing model | Fewer, more specialized staff | Distributed generalists |
| Equipment cost | Lower (shared resources) | Higher (full kit per site) |
| Recommendation | Hybrid: Central design hub + local production | For locations with experienced staff |
π£ Executive Decision Required: Centralized vs. distributed design center model
SSO and Credentialing
β Single Sign-On Integration
- Configure SAML/OAuth with enterprise identity provider
- Map role-based access controls to AD groups
- Establish session timeout policies (HIPAA-compliant)
- Test SSO across all location types
β Centralized Credentialing
- Create provider credential database linked to Glidewell accounts
- Automate license verification checks
- Establish onboarding/offboarding workflows
- Configure DEA/NPI mapping for prescription integrations
Estimated time: 8β16 hours for SSO configuration, 4 hours for credentialing setup
3. Location Readiness Assessment
Scoring Framework
Factor 1: IT Infrastructure Maturity (1β5)
| Score | Criteria |
|---|---|
| 1 | Network <50 Mbps, hardware >5 years old, unsupported PMS version |
| 2 | Network 50β100 Mbps, hardware 4β5 years old, PMS 1β2 versions behind |
| 3 | Network 100β150 Mbps, hardware 2β3 years old, current PMS version |
| 4 | Network 150β250 Mbps, hardware <2 years old, current PMS, some integrations active |
| 5 | Network >250 Mbps, new hardware, current PMS, existing digital workflow experience |
Factor 2: Staff Tenure and Adaptability (1β5)
| Score | Criteria |
|---|---|
| 1 | Turnover >40%, no tech training history, documented resistance to change |
| 2 | Turnover 30β40%, minimal tech training, passive resistance observed |
| 3 | Turnover 20β30%, some tech training, neutral toward new technology |
| 4 | Turnover 10β20%, regular tech training, positive toward digital tools |
| 5 | Turnover <10%, certified digital workflow staff, active technology champions |
Factor 3: Patient Volume (1β5)
| Score | Criteria |
|---|---|
| 1 | <50 restorative cases/month (low impact, safe pilot) |
| 2 | 50β75 restorative cases/month |
| 3 | 75β100 restorative cases/month (balanced impact/risk) |
| 4 | 100β150 restorative cases/month |
| 5 | >150 restorative cases/month (high impact, high risk) |
Factor 4: Existing Tech Stack Compatibility (1β5)
| Score | Criteria |
|---|---|
| 1 | PMS with no API, analog imaging, no scanner |
| 2 | PMS with limited API, digital x-rays only, no scanner |
| 3 | PMS with standard API, digital imaging, basic scanner |
| 4 | PMS with full API, integrated imaging, advanced scanner, CBCT |
| 5 | Full digital workflow today, Glidewell lab customer, cloud-native systems |
Factor 5: Local Champion Availability (1β5)
| Score | Criteria |
|---|---|
| 1 | No identifiable champion, leadership skeptical |
| 2 | Possible champion but limited bandwidth or influence |
| 3 | Willing champion identified but needs development |
| 4 | Strong champion with bandwidth, respected by team |
| 5 | Multiple champions, proven change leadership track record |
Composite Readiness Score Calculation
Formula: (IT Γ 1.2) + (Staff Γ 1.3) + (Volume Γ 0.8) + (Tech Stack Γ 1.0) + (Champion Γ 1.2) = Readiness Score
Weighting rationale: Staff adaptability and champion availability are strongest predictors of success; volume is managed risk
| Readiness Score | Recommendation |
|---|---|
| 22β27.5 | Wave 1 Candidate (Pilot) |
| 17β21.9 | Wave 2 Candidate |
| 12β16.9 | Wave 3 Candidate |
| <12 | Remediation required before rollout |
Sample Location Readiness Assessment
| Location | IT (Γ1.2) | Staff (Γ1.3) | Volume (Γ0.8) | Tech (Γ1.0) | Champion (Γ1.2) | Total | Wave |
|---|---|---|---|---|---|---|---|
| Metro Center | 4 (4.8) | 5 (6.5) | 4 (3.2) | 4 (4.0) | 5 (6.0) | 24.5 | Wave 1 |
| Suburban East | 3 (3.6) | 4 (5.2) | 3 (2.4) | 5 (5.0) | 4 (4.8) | 21.0 | Wave 2 |
| Downtown | 5 (6.0) | 3 (3.9) | 5 (4.0) | 4 (4.0) | 3 (3.6) | 21.5 | Wave 2 |
| Rural West | 2 (2.4) | 4 (5.2) | 2 (1.6) | 2 (2.0) | 3 (3.6) | 14.8 | Wave 3 |
| New Acquisition | 1 (1.2) | 2 (2.6) | 3 (2.4) | 1 (1.0) | 2 (2.4) | 9.6 | Remediation |
β Complete readiness assessment for all locations β Validate scores with regional managers β Finalize wave assignments β Create remediation plans for low-scoring locations
Estimated time: 2 hours per location assessment, 4 hours for portfolio analysis
4. Rollout Strategy
Wave Structure Recommendation
Wave 1: Pilot (2β3 Locations) β Weeks 3β8
Selection Criteria for Wave 1:
- Readiness score >22
- Geographic diversity (different regions represented)
- PMS diversity (include both Dentrix and Eaglesoft if both exist in portfolio)
- Mix of practice sizes (one high-volume, one moderate)
- Accessible to central team for hands-on support
- NOT flagship locations (protect high-revenue sites from pilot risk)
Wave 1 Objectives:
- Validate installation and configuration playbook
- Test all integrations in production environment
- Develop troubleshooting knowledge base
- Refine training materials based on real feedback
- Establish realistic productivity benchmarks
- Identify unanticipated workflow impacts
Timeline:
| Week | Activity |
|---|---|
| 3 | Equipment delivery and installation at all Wave 1 sites |
| 4 | π΅ Vendor-led configuration and integration |
| 5 | Staff training and parallel operation |
| 6 | Go-live and intensive support |
| 7 | Stabilization and optimization |
| 8 | Wave 1 retrospective and Wave 2 preparation |
Wave 2: Scaled Deployment (5β8 Locations) β Weeks 9β14
Selection Criteria for Wave 2:
- Readiness score 17β22
- Leverage Wave 1 learnings and trained champions
- Include 1β2 "stretch" locations to test remediation effectiveness
- Balance high-volume and moderate-volume sites
Timeline:
| Week | Activity |
|---|---|
| 9 | Equipment delivery for Wave 2 cohort |
| 10 | Configuration using standardized templates from Wave 1 |
| 11 | Champion-led training (using train-the-trainer model) |
| 12 | Staggered go-lives (2β3 locations per day) |
| 13 | Stabilization across cohort |
| 14 | Wave 2 retrospective and Wave 3 preparation |
Wave 3+: Full Portfolio (Remaining Locations) β Weeks 15β26
Approach:
- Deploy in sub-waves of 8β10 locations
- 2-week cycles per sub-wave
- Champions from Waves 1β2 assist with peer locations
- Reduced central support (shift to regional ownership)
Timeline:
| Weeks | Sub-Wave | Locations |
|---|---|---|
| 15β16 | 3A | 8β10 locations |
| 17β18 | 3B | 8β10 locations |
| 19β20 | 3C | 8β10 locations |
| 21β22 | 3D | Remaining standard locations |
| 23β26 | Remediation | Previously delayed/deferred sites |
π£ Go/No-Go Criteria Between Waves
Wave 1 β Wave 2 Advancement Criteria
| Category | Green (Go) | Yellow (Conditional Go) | Red (No-Go) |
|---|---|---|---|
| Technical Stability | <5% system downtime, all integrations functional | 5β10% downtime, minor integration issues resolved | >10% downtime, critical integration failures |
| Adoption Rate | >80% of cases using new workflow | 60β80% adoption | <60% adoption |
| Quality Metrics | Remake rate β€ baseline | Remake rate β€1.5Γ baseline | Remake rate >1.5Γ baseline |
| Staff Confidence | >4.0/5.0 comfort score | 3.5β4.0 comfort score | <3.5 comfort score |
| Time to Competency | Within training estimates | Up to 25% over estimates | >25% over training estimates |
| Patient Experience | No complaints, positive feedback | Isolated complaints, resolved | Multiple unresolved complaints |
β οΈ Any RED metric = mandatory pause and remediation before proceeding
π£ Executive Decision Required: Advancement decision documented with sign-off from VP Operations and CDO
Rollback Plan
Trigger Events for Rollback
- Critical system failure affecting patient care
- Data loss or HIPAA breach incident
20% of scheduled cases unable to complete
- Provider or staff safety concern
- Vendor unable to resolve critical issue within 4 hours
Rollback Procedure by Severity
Level 1: Workflow Rollback (Location-Level)
- Revert to traditional lab workflow immediately
- Document all affected cases
- Notify vendor support of issue
- Continue patient care with backup process
- Investigate root cause before resuming Estimated recovery: 2β4 hours
Level 2: Wave Pause
- Halt all go-lives in current wave
- Active locations continue with enhanced monitoring
- Convene emergency retrospective within 24 hours
- Develop remediation plan
- π£ Executive approval required to resume Estimated recovery: 1β2 weeks
Level 3: Program Pause
- All locations revert to traditional workflow
- Equipment remains installed but dormant
- π΅ Vendor escalation to executive level
- π£ Board notification required
- Independent review before resumption Estimated recovery: 4β8 weeks
Cross-Location Protection
- Waves operate independently
- Issues in one wave do not automatically affect others
- Shared learnings distributed, but execution isolated
- Central team maintains separate support capacity per wave
5. Configuration & Integration (Weeks 2β3)
Step-by-Step PMS Integration
Dentrix Integration
β Step 1: Verify Dentrix Version Compatibility
- Minimum version: Dentrix G7.3 or later
- Verify eCentral subscription is active
- Confirm Dentrix API access is enabled Estimated time: 30 minutes
β Step 2: Install Glidewell Integration Module
- π΅ Obtain integration package from Glidewell
- Run installer on each Dentrix workstation
- Restart Dentrix services after installation
- Verify integration appears in Dentrix toolbar Estimated time: 45 minutes per workstation
β Step 3: Configure Patient Data Sync
- Map patient ID fields between systems
- Configure demographic field mapping
- Set up insurance/eligibility data flow
- Enable real-time vs. batch sync preferences Estimated time: 2 hours
β οΈ Step 4: Test Patient Lookup and Case Creation
- Create test patient in Dentrix
- Initiate case in Glidewell system
- Verify patient data auto-populates
- Confirm treatment plan flows correctly
- Test bi-directional status updates Estimated time: 1 hour testing
β Step 5: Configure Procedure Code Mapping
- Map Glidewell case types to ADA codes
- Configure auto-posting of completed procedures
- Set up fee schedule integration (if applicable)
- Test end-to-end procedure flow Estimated time: 2 hours
Eaglesoft Integration
β Step 1: Verify Eaglesoft Version and Modules
- Minimum version: Eaglesoft 21.x
- Patterson Imaging integration active
- API access credentials obtained Estimated time: 30 minutes
β Step 2: Install Bridge Software
- π΅ Receive Glidewell-Eaglesoft bridge installer
- Install on server (client-server) or each workstation (standalone)
- Configure connection strings
- Test database connectivity Estimated time: 1 hour per installation
β Step 3: Configure Data Exchange
- Set up patient search parameters
- Map appointment types to case workflows
- Configure image attachment pathways
- Enable clinical note templates Estimated time: 2 hours
β οΈ Step 4: Validate Image Transfer
- Test intraoral scan upload
- Verify CBCT integration path
- Confirm 2D radiograph accessibility
- Test image quality in Glidewell system Estimated time: 1.5 hours
Open Dental Integration
β Step 1: Enable Open Dental API
- Navigate to Setup > Program Links
- Enable API module (may require additional license)
- Generate API credentials
- Configure allowed endpoints Estimated time: 45 minutes
β Step 2: π΅ Configure Glidewell Connection
- Enter API credentials in Glidewell admin portal
- Configure webhook endpoints for real-time sync
- Set up authentication token refresh schedule
- Test API connectivity Estimated time: 1.5 hours
β Step 3: Map Clinical Data
- Configure procedure code mapping
- Set up provider assignment rules
- Map operatory/equipment relationships
- Configure scheduling integration (if applicable) Estimated time: 2 hours
β Step 4: Test Workflow End-to-End
- Create test case through full cycle
- Verify data appears correctly in both systems
- Test error handling scenarios
- Document any custom configurations Estimated time: 2 hours
Imaging System Integration
Intraoral Scanner Integration
β iTero Element Series
- Enable Glidewell export destination
- Configure automatic case routing
- Set default prescription parameters
- Test scan export workflow Estimated time: 1 hour
β 3Shape TRIOS
- Add Glidewell to lab connections
- Configure case submission preferences
- Set up case tracking visibility
- Test end-to-end submission Estimated time: 1 hour
β Primescan/CEREC
- Configure Glidewell connection portal
- Set up design preferences (if applicable)
- Test scan data transfer
- Verify shade/material data transmission Estimated time: 1.5 hours
CBCT Integration
β Configure DICOM Export
- Set up Glidewell as DICOM destination
- Configure automatic or manual export rules
- Verify volume data format compatibility
- Test surgical guide workflow Estimated time: 2 hours
Test Environment Setup
Validation Checklist
β Patient Data Flow
- New patient creation in PMS appears in Glidewell
- Patient demographics update bidirectionally
- Insurance information transfers correctly
- Treatment plans sync appropriately
β Case Creation and Management
- Case initiated from PMS successfully
- Scan data attaches to correct case
- Case status updates reflect in PMS
- Completed case updates patient record
β Image Transfer
- Intraoral scans transmit at full resolution
- CBCT data accessible in design software
- 2D radiographs viewable as reference
- Image orientation and scaling correct
β Billing Integration
- Procedure codes post correctly to PMS
- Fee schedules apply accurately
- Insurance eligibility checks function (if applicable)
- Claim generation works correctly
Data Migration / Historical Data Ingestion
β Assess Historical Data Needs
- Determine if legacy case data should migrate
- Identify date range for historical import
- Map legacy data fields to new schema
- Plan for data quality issues Estimated time: 4 hours planning
β Execute Migration (if applicable)
- π΅ Work with Glidewell data services team
- Export data from legacy systems
- Transform and validate data
- Import to Glidewell platform
- Verify data integrity post-migration Estimated time: 1β3 days depending on volume
Security and HIPAA Compliance Verification
Enterprise-Level HIPAA Checklist
β Business Associate Agreement
- π΅ Execute BAA with Glidewell
- Verify BAA covers all subsidiaries/locations
- Confirm data retention and destruction policies
- Document BAA in compliance records Estimated time: 1β2 weeks (legal review)
β Data Governance
- Define data ownership and stewardship
- Establish data classification scheme
- Configure data retention policies
- Set up audit logging and retention Estimated time: 4 hours
β Access Controls
- Implement role-based access control (RBAC)
- Configure minimum necessary access principles
- Set up privileged access management
- Enable multi-factor authentication
- Configure session timeout policies Estimated time: 3 hours per location
β Technical Safeguards
- Verify encryption at rest (AES-256)
- Confirm encryption in transit (TLS 1.2+)
- Enable audit trail functionality
- Configure backup and disaster recovery
- Test incident response procedures Estimated time: 8 hours enterprise-wide
β Documentation
- Update HIPAA policies to include new system
- Document data flow diagrams
- Create user access request procedures
- Establish breach notification protocols Estimated time: 4 hours
DSO-Specific Configuration
Standardized Configuration Template
Settings to Standardize Centrally:
| Setting Category | Specific Parameters |
|---|---|
| Security | Password policies, session timeouts, MFA requirements |
| Integration | PMS connection parameters, API keys, webhook endpoints |
| Quality | Margin thickness defaults, material defaults by case type |
| Naming Conventions | Case numbering scheme, file naming structure |
| Reporting | Metric definitions, report templates, dashboard layouts |
| Communication | Notification preferences, escalation contacts |
Settings Allowing Local Discretion:
| Setting Category | What Can Vary |
|---|---|
| Provider Preferences | Shade matching approach, design style preferences |
| Scheduling | Scan time allocations, production batching schedules |
| Materials | Brand preferences within approved list |
| Workflow | Morning vs. afternoon production, rush case handling |
Centralized vs. Per-Location Testing
Recommended Approach: Hybrid
Central Test Environment
- Master configuration validation
- Integration testing with each PMS version
- Security penetration testing
- New version qualification testing
Per-Location Validation
- Site-specific integration verification
- Local equipment calibration
- Staff readiness confirmation
- Patient communication testing
β Create centralized test environment (Week 2) β Validate master configuration (Week 2) β Develop per-location validation checklist (Week 2) β Execute per-location validation for Wave 1 (Week 3)
Estimated time: 8 hours central setup, 2 hours per location validation
6. Team Training Plan
Train-the-Trainer Model
Champion Selection Criteria
Required Qualifications:
- Minimum
AI-generated implementation guide based on public vendor information. Verify specifics directly with Glidewell.